• فارسی

Razavi Hospital

Project description

Razavi Hospital’s engine room facilities are more complex and important than any other building. The components of the hospital engine room are not much different from other engine rooms and it is the sensitivity of using the hospital heating and cooling system that makes the main difference between the heating and cooling facilities of the hospital and other buildings.

Project details

Client: Razavi Hospital

Date: 7 Azar 1399

Position: Highway of the Great Prophet

Manufacturer: Toos Palayesh Sazeh Company

Related portfolio

توس پالایش سازه
Toos Palayesh Sazeh

Toos Palayesh Sazeh Manufacturing and industrial company with the aim of consulting, designing, producing and supplying clean air to operating rooms of hospitals, production halls for sensitive electronic components, laboratories, food production halls, clean rooms and all places that need clean air.

Contact us